Reverie Blvd.
 
 
Reverie Blvd #10: Scoring
Friday, April 11, 2008
Music breathes life into film. It is what gives the viewer that subtle emotional nudge or makes them want to stand up and cheer. The music needed for Reverie was going to have to have a little bit
 
Reverie Blvd #9: Editing
Tuesday, February 19, 2008
While the preproduction and production phases are certainly time consuming processes, post production is easily three quarters of where my time is spent on each project. Even as we were in the
 
Reverie Blvd #8: Filming
Monday, January 21, 2008
After months of preproduction, location scouting, casting, and scheduling, we began principle shooting of “Reverie Blvd.” on July 20th, 2007.  
          I don’t know whether the shooting is my
 
Reverie Blvd #7: Equipment
Tuesday, January 1, 2008
Special thanks should be given to The Art Institute of Atlanta, specifically my department chair Rob Albertson and portfolio teacher Fran Burst, without whom this entire project simply would not
 
Reverie Blvd #6: Crew
Tuesday, January 1, 2008
What can be said of my crew? Tireless, hard-working, and dependable, the special people that helped to bring “Reverie Blvd.” to life sacrificed their time, energy, and (most likely) their sanity, to
 
The official blog of Dehut Pictures upcoming film, “Reverie Blvd.” presented by Craig Dehut, the film’s producer, writer, and director.
 
*UPDATES*
- New Blog Entry (4/11)
 
 
 
 
© 2007 “Reverie Blvd.” Dehut Pictures. All rights reserved.